4. |
After installing the pressure side impact sensor, confirm proper
system operation:
A. |
Turn the ignition switch ON; the SRS indicator light should
be turned on for about six seconds and then go off.
|
• |
You must comply with the specified tightening
torques with the tool specified because Pressure – Side
Impact Sensors (P-SIS) may be broken or POP-NUT may
be rotated.
|
• |
Problems may be occurred in the durability of
P-SIS or impact sensing performance may be depreciated
if POP-NUT is rotated.
|
• |
The door module must not be transformed because
SRSCM judges a impact through the pressure sensor in
the door module.
|
|
|